Today was a half day we started by heading over to the TOA site and looking around he explained everything that was going on in the building and how they are building up for the MRI pad and what each bracing was as well as how the built the building it is a leaning technic were the build the cement walls on the ground and lean them up it is a more cost affective way of building. At the site we had the meeting they talked finance and how it was coming in under budget so what my boss said was that the meetings can be tense if things aren’t good like they were today. Then they went over sign placement and I actually pitched in an idea that they actually decided on in the end which was to make the sign a triangle and then the day was over. 